Trades & DIY
Concrete & Post-crete Bag Calculator
Work out bagged concrete for slabs and footings, or post-crete for fence posts.

- Volume needed
- 0.792 m³
- 25kg bags to buy
- 73
- Estimated cost
- £474.50
Concrete quantities: from measured space to an order
Concrete ordering begins with the finished, compacted volume, not the volume of loose ingredients in a mixer. Measure the excavation or shuttering in metres and convert the depth from millimetres before multiplying. A 100 mm slab is 0.1 m thick, not 100 m. Small depth errors spread across a large base: an extra 20 mm over 10 m² consumes another 0.2 m³. Measure several positions if the sub-base is uneven, and use a realistic average rather than the shallowest spot.
The calculator uses an assumed mixed yield of 0.011 m³ per 25 kg bag. This is an estimating value, not a promise that every bagged product has that yield. Check the manufacturer's declared coverage and instructions before ordering. Fast-setting post mix, general-purpose premixed concrete and mortar are not interchangeable. The displayed cost covers the selected concrete bags only; delivery, reinforcement, formwork, excavation, tools and labour remain separate items in your budget.
Worked slab example
For a 3 m by 2.4 m slab at 100 mm depth, the geometric volume is 3 × 2.4 × 0.1 = 0.72 m³. Selecting 10% extra gives 0.792 m³. Dividing by the assumed 0.011 m³ yield gives exactly 72 bags. At £6.50 each, the bag-only estimate is £468. Compare that quantity with a ready-mix quotation and the practical time needed to mix, place and compact the material consistently. The allowance is for uncertainty and losses; it is not a substitute for specifying the correct thickness.
Worked post-hole example
A circular hole 300 mm in diameter and 600 mm deep has a volume of π × 0.15² × 0.6, approximately 0.0424 m³. A circular 100 mm post occupying that depth displaces approximately 0.0047 m³. The remaining concrete volume is about 0.0377 m³ per hole. Four identical holes need about 0.1508 m³ before allowance, or 0.1659 m³ with 10% extra: 16 bags after rounding up. Square posts displace a different volume. This tool models the post as circular, so its result is only an approximation when you enter the width of a square timber post.
Mix ratios and dry-to-wet volume
A nominal 1:2:3 mix describes one part cement, two parts sand and three parts coarse aggregate by loose volume; 1:2:4 uses relatively more coarse aggregate. These ratios do not, by themselves, guarantee a concrete strength class. Water content, aggregate grading, cement type, mixing, compaction and curing all affect performance. Structural work should use the engineer's specified concrete rather than a generic recipe. The bag calculator does not design a mix or split its result into cement, sand and aggregate quantities.
For an illustrative loose-material estimate, a dry-to-wet multiplier of 1.54 would turn 1 m³ of finished concrete into 1.54 m³ of loose ingredients. With a 1:2:4 ratio, the seven parts would then be approximately 0.22 m³ cement, 0.44 m³ sand and 0.88 m³ aggregate. The 1.54 value is a rule-of-thumb assumption, not a universal shrinkage constant or an extra multiplier for premixed bags. Do not apply it to the bag count above: the stated bag yield already refers to mixed concrete.
Placing, curing and practical checks
Prepare a stable, compacted sub-base and secure formwork before concrete arrives. Plan safe access and handling: dozens of 25 kg bags create a substantial manual-handling task. Add only the water specified for the product. Extra water can make placement easier but may reduce strength and increase shrinkage. Do not use an allowance percentage to compensate for a poorly prepared foundation or a design that has not been checked.
Curing means managing moisture and temperature while the concrete gains strength. Protect fresh work from rapid drying, heavy rain, frost and premature loading, following the supplier's instructions. A surface that looks dry is not necessarily ready for machinery, walls or vehicle traffic. Post products may have different setting procedures, including whether water is added before or after the dry mix. Read the actual packaging rather than assuming ordinary concrete instructions apply.
Concrete questions
Should I choose 5%, 10% or 15% extra?
Use a smaller allowance only for well-measured, controlled work. Uneven excavations, spillages and inaccessible corners justify more contingency. These are selectable planning allowances, not building-standard requirements. Recheck dimensions if the estimate changes unexpectedly.
Does this choose a safe footing or slab depth?
No. It converts the dimensions you supply into a purchase estimate. Ground conditions, loads, frost exposure and reinforcement need a suitable specification. For load-bearing or regulated work, obtain professional advice before buying materials.
How the bag calculation works
A standard 25kg bag of concrete mix yields roughly 0.011 m³ once mixed — about 90 bags per cubic metre. The calculator works out your volume, adds your chosen allowance for spillage and uneven excavation, then divides by the bag yield and rounds up.
For posts, the hole volume is a cylinder (π × r² × depth) minus the volume the post itself takes up, multiplied by the number of posts.
How deep should a fence post hole be?
The rule of thumb is one third of the post height in the ground, plus around 100mm of gravel at the bottom for drainage. A 1.8m (6ft) fence usually means a 600mm deep hole. In exposed or soft ground, go deeper.
Typical bag counts
| Job | Volume | 25kg bags |
|---|---|---|
| 1 post hole (300 × 600mm, 100mm post) | 0.041 m³ | ~4 |
| Shed base 2.4 × 1.8m × 75mm | 0.36 m³ | ~33 |
| Path 3 × 1m × 100mm | 0.33 m³ | ~31 |
| Small slab 3 × 2.4m × 100mm | 0.79 m³ | ~73 |
When to order ready-mix instead
Above about 0.5 m³ (roughly 45 bags), mixing by hand or with a small mixer becomes slow and hard to keep consistent. Consider a mini-mix delivery or a volumetric lorry — often cheaper per cubic metre and far less effort.
